At the end of the project we will be able establish between UE and eNodeB the SRB0/SRB1/DRBs.  And UE and EnodeB can able to perform following procedures Paging, System Information , Connection control procedures ( RRC establishment , RRC reconfiguration , RRC release , RRC radio resource configuration).
 
At the end of the project we will be able establish between UE and eNodeB the SRB0/SRB1/DRBs.  And UE and EnodeB can able to perform following procedures Paging, System Information , Connection control procedures ( RRC establishment , RRC reconfiguration , RRC release , RRC radio resource configuration).
  
       ''Items''         ''Time''  
+
'''Time schedule'''
 +
 
 +
       '''''Items'''''         '''''Time'''''  
 
       Basic Framework         One week
 
       Basic Framework         One week
 
       System Information One week
 
       System Information One week

Revision as of 16:30, 19 May 2011

Objective Current RRC entity in the present LTE module of ns-3 has the handling of user plane. This proposal is to enhance and develop the RRC entity is ns-3 LTE for control plane handling in UE and eNodeB. We aim to incorporate following functionality viz. Paging, System Information (MIB, SIBType1 and SIBType2) and connection control (RRC establishment, RRC reconfiguration, RRC release and RRC resource configuration)

List of Functions to be implemented in this project • System Information: Reception and transmission at UE and eNodeB • Paging: Reception and Transmission at UE and eNodeB • Connection control Procedures: Following procedures have been identified for the implementation in during NSoC 2011.

       RRC connection establishment ,
       RRC Connection Reconfiguration ,
       RRC Connection Release ,
       UE action upon leaving

Deliverables At the end of the project we will be able establish between UE and eNodeB the SRB0/SRB1/DRBs. And UE and EnodeB can able to perform following procedures Paging, System Information , Connection control procedures ( RRC establishment , RRC reconfiguration , RRC release , RRC radio resource configuration).

Time schedule

      Items 	         Time 
      Basic Framework	         One week
      System Information	 One week
      Paging	                 One week
      Connection Control  	 Three week
      Integration and testing	 Three  week
      Final wrap-up	         Two week