NSOC2022Ping: Difference between revisions
Jump to navigation
Jump to search
Chandrakant (talk | contribs) |
Chandrakant (talk | contribs) |
||
Line 58: | Line 58: | ||
* Discussed plans and approach for adding the Interface Address feature. | * Discussed plans and approach for adding the Interface Address feature. | ||
* Didn't add much code due to my semester exam. | * Didn't add much code due to my semester exam. | ||
'''Week 7''' | |||
Duration July 30 - August 4 | |||
* Added two new features Interface_address and destination address to the new Ping Application. | |||
* Destination feature had some bugs and I fixed them. | |||
* Added Count test case for IPv4 and IPv6. |
Revision as of 16:22, 9 August 2022
Back to NSoC 2022 projects
Project Overview
- Project Name: Ping and Ping6 Enhancements in ns-3
- Student: Chandrakant Jena
- Mentors: Tommaso Pecorella, Tom Henderson
- Project Goals: Create a new Ping application for ns-3, to replace the existing v4Ping and Ping6.
- The two applications "V4Ping" and "Ping6" do their respective jobs, but they have some main issues:
- They have different parameters
- There is a lot of code duplication
- They have an output that is not consistent with the one you get in Linux
- The two applications "V4Ping" and "Ping6" do their respective jobs, but they have some main issues:
- Repository: https://gitlab.com/tommypec/ns-3-dev-new-ping (branch 'nsoc-22')
- About Me: I am currently a BCA Student (Bachelor's of Computer Application) at Utkal University, Bhubaneshwar, Odisha, India. I am interested in Computer Networking and Problem-solving. I have a huge interest in Opensource software development, I was excited to open source in my 6th Grade when I first used the vlc media player. I started open source by participating in GCI, I contributed to CCEXTRACTOR but due to some academic commitments I was not able to complete it. I have developed several projects during my academics (Linked In) and Finally got a chance to develop some projects of my interest i.e Computer Networking. I Joined Ns-3 in September 2021 because I developed some interest in computer Networking and always wanted to get some practical experience, Thanks to Ns-3. Apart from this, I am a sports lover, I used to play cricket and football which later refreshes my mind and help me to concentrate on my work.
Milestones and Deliverables
- Detailed Project Plan and Approach ( I will continuously update throughout the NSoC program duration)
Weekly Reports
Week 1
Duration: June 13 - June 19
- Learned about the original Linux Ping Application working.
- visualized the attributes present in Linux Ping Application and relate to that of Ns-3 Ping Application.
- Discussed approach plans with mentors, attributes to be added, Functionality, and Expected output for the New Ping application.
Week 2 (Taken Leave)
Duration: June 20 - July 5
- I have Taken leave because of my Entrance Examination on 5 July. Does not contribute much to the project.
Week 3
Duration July 6 - July 11
- Added initial code to bring support for IPv4 in the Ping Application commit.
- Discussed with mentors to develop the Ping example.
Week 4
Duration July 12 - July 17
- Developed Ping example but it had some issues while building the topology.
- Learned to use Ns-3 Debugger to debug source code.
Week 5
Duration July 18 - July 23
- Ping-example have been developed successfully.
- Developed count feature for the new ping application.
Week 6
Duration July 24 - July 29
- Discussed plans and approach for adding the Interface Address feature.
- Didn't add much code due to my semester exam.
Week 7
Duration July 30 - August 4
- Added two new features Interface_address and destination address to the new Ping Application.
- Destination feature had some bugs and I fixed them.
- Added Count test case for IPv4 and IPv6.