LTE RRC Extension: Difference between revisions
Pankaj303er (talk | contribs) m (update) |
Pankaj303er (talk | contribs) No edit summary |
||
Line 11: | Line 11: | ||
'''Deliverables''' | '''Deliverables''' | ||
At the end of the project we will be able establish between UE and eNodeB the SRB0/SRB1/DRBs. And UE and EnodeB can able to perform following procedures Paging, System Information , Connection control procedures ( RRC establishment , RRC reconfiguration , RRC release , RRC radio resource configuration). | At the end of the project we will be able establish between UE and eNodeB the SRB0/SRB1/DRBs. And UE and EnodeB can able to perform following procedures Paging, System Information , Connection control procedures ( RRC establishment , RRC reconfiguration , RRC release , RRC radio resource configuration). | ||
''Items'' ''Time'' | |||
Basic Framework One week | |||
System Information One week | |||
Paging One week | |||
Connection Control Three week | |||
Integration and testing Three week | |||
Final wrap-up Two week |
Revision as of 16:29, 19 May 2011
Objective Current RRC entity in the present LTE module of ns-3 has the handling of user plane. This proposal is to enhance and develop the RRC entity is ns-3 LTE for control plane handling in UE and eNodeB. We aim to incorporate following functionality viz. Paging, System Information (MIB, SIBType1 and SIBType2) and connection control (RRC establishment, RRC reconfiguration, RRC release and RRC resource configuration)
List of Functions to be implemented in this project • System Information: Reception and transmission at UE and eNodeB • Paging: Reception and Transmission at UE and eNodeB • Connection control Procedures: Following procedures have been identified for the implementation in during NSoC 2011.
RRC connection establishment , RRC Connection Reconfiguration , RRC Connection Release , UE action upon leaving
Deliverables At the end of the project we will be able establish between UE and eNodeB the SRB0/SRB1/DRBs. And UE and EnodeB can able to perform following procedures Paging, System Information , Connection control procedures ( RRC establishment , RRC reconfiguration , RRC release , RRC radio resource configuration).
Items Time Basic Framework One week System Information One week Paging One week Connection Control Three week Integration and testing Three week Final wrap-up Two week