Ns-3.25: Difference between revisions
Jump to navigation
Jump to search
(update) |
|||
Line 11: | Line 11: | ||
* A RIPv2 routing implementation for IPv4 | * A RIPv2 routing implementation for IPv4 | ||
* nanosecond time resolution for PCAP traces | * nanosecond time resolution for PCAP traces | ||
* Priority queueing layer and flow control in the IP stack | |||
* Dynamic rate control for Wi-Fi HT/VHT modes (Ideal rate control, and Minstrel HT) | |||
* | |||
* | |||
= Release and development schedule = | = Release and development schedule = | ||
'''Updated | '''Updated Thursday March 10''' | ||
* | No further checkins to the ns-3 code are planned. The following release schedule is planned: | ||
* | * Fri. March 11: Update regression trace data for two failing NSC tests | ||
* | * Fri. March 11: Post release candidate 1 | ||
* Mon. March 14: Documentation updating, post release candidates as needed. | |||
* Wed. March 16: post ns-3.25 release if no issues are found | |||
= Packaging = | = Packaging = | ||
Same packaging as ns-3.24 (allinone tar.bz2 file) | Same packaging as ns-3.24 (allinone tar.bz2 file) | ||
Revision as of 01:12, 11 March 2016
Main Page - Roadmap - Summer Projects - Project Ideas - Developer FAQ - Tools - Related Projects
HOWTOs - Installation - Troubleshooting - User FAQ - Samples - Models - Education - Contributed Code - Papers
This page summarizes the release planning for ns-3.25 (rescheduled to February 2016). The ns-3 release process is listed here and here.
Release goals
Already added
- A new TCP implementation developed under this project
- TCP Hybla and HighSpeed paper presentation
- Split of the 'applications' module to a new 'internet-apps' module
- A RIPv2 routing implementation for IPv4
- nanosecond time resolution for PCAP traces
- Priority queueing layer and flow control in the IP stack
- Dynamic rate control for Wi-Fi HT/VHT modes (Ideal rate control, and Minstrel HT)
Release and development schedule
Updated Thursday March 10
No further checkins to the ns-3 code are planned. The following release schedule is planned:
- Fri. March 11: Update regression trace data for two failing NSC tests
- Fri. March 11: Post release candidate 1
- Mon. March 14: Documentation updating, post release candidates as needed.
- Wed. March 16: post ns-3.25 release if no issues are found
Packaging
Same packaging as ns-3.24 (allinone tar.bz2 file)